PROJECT - REFURBISHMENT
SPACE
Open Plan
Training Rooms
Kitchen
Breakout
Executive Lounge
As part of an ongoing client upgrade contract we are refurbishing future training areas, staff breakout areas and the introduction of acoustic pods. We have also supplied and installaded new LED lighting throughout the whole building.
RONTEC
RONTEC
RONTEC
PROJECT - DESIGN & BUILD
SPACE
Reception
Open Plan
Boardroom
Executive Offices
Acoustic Pods
We carried ourt a complete design and build contract for their new 10,000 square feet headquarters building. This involved a new furniture and partitioning package and a complete client move from their existing building.
AIB INTERNATIONAL BANK
AIB INTERNATIONAL BANK
AIB INTERNATIONAL BANK
PROJECT - DESIGN & BUILD
SPACE
Open Plan
Kitchen
Breakout Spaces
Quiet Rooms
Boardroom
Multiple sites and a nationwide roll-out programme to introduce new working practices for this International Bank. Carefully selected flexible furniture products were specified for future proofing the banks portfolio of network offices.
TAJ HOTEL | ST. JAMES' COURT
TAJ HOTEL | ST. JAMES' COURT
TAJ HOTEL | ST. JAMES' COURT
PROJECT - MAINTENANCE
SPACE
Ongoing Maintenance
Upgrading of Air-Conditioning Systems
One of the largest hotels in London made it's debut as a hotel in 1902. Featuring 329 Rooms and Suites we provided ongoing maintenance and upgrading of the air-conditioning systems within this complex, historic building.
SALESFORCE TOWER
SALESFORCE TOWER
SALESFORCE TOWER
PROJECT - LIGHTING
SPACE
Design and Development of LED Light Fittings for Stairworks
The project contract was for the fitting out and replacement of all existing light fittings with new LED lighting to this 49 floored building's stairwell. This required detailed planning and execution, including ongoing risk assessments for this most complex of projects.
SALESFORCE TOWER
SALESFORCE TOWER
SALESFORCE TOWER
PROJECT - DELAPS
SPACE
Electrical and Air Conditioning
Heating
Lighting
Re-decoration and Refurbishment of Raised Floor
The project involved demolition works, removal of existing ceiling, lighting, partitions and flooring. New ceilings and LED lighting was installed and walls repaired and painted, floor tiles were recycled and new floor tiles installed.
MACE
MACE
MACE
PROJECT - REFURBISHMENT
SPACE
Complete Building Refurbishment including
Electrical
Audio Visual
Carpeting
Decoration
New Furniture
Complete Client Move
One of the leading international cost consultants and construction companies approached us to refurbish their new regional Winchester Headquarters over three floors a total of 6,500 square feet of office space.